This villa is located in a beach side and is constructed to French traditional design, consist of basement, ground and first floor. Project was challenging due to the custom design alterations during the course of the project, but adhering to the standards. Our scope was to supply, install, test and commission the entire MEP works.

Project Details

Built Up Area:
1 050 m2
Contract Period:
18 months
Contract Value:
AED 1 900 000 (OMR 200 000)
Location:
Oman
Client:
Her Highness Sayyida Tania Bint Shabib Al Said
Project Engineer:
KGDMT
Main Contractor:
Z.G.P Zachariades