The Scope of work constitutes of refurbishment of the existing arrival forecourt area and upper departure level of Terminal 1 building. The works is in two parts comprising SP500_PK31: T1 Modifications (Arrival Forecourt) and SP500_PK33/33a: Reallocation of Office Spaces.

Project Details

Built Up Area:
55 000 m²
Contract period:
16 months
Contract Value:
AED 160 000 000 ($43 500 000)
Location:
Dubai Airport
Client:
Dubai Aviation Engineering Projects
Project Engineer:
Dar Al-Handasah
Quantity Surveyors:
Turner & Townsend