BP Khazzan KOB & KRC
Project Details
- Built Up Area: 31,018 m²
- Contract Period: 21 months
- Contract Value: AED 129 million
- Location: Oman
- Main Contractor: Carillion Alawi LLC
- Project Engineer: ATKINS
Description
BP Khazzan KOB & KRC
Project consist of two self-contained facilities, the Khazzan Operations base (KOB) and a Khazzan Residential Complex (KRC). Located in the vicinity of central processing facility (CPF) in the southern half of Block 61 located 350 kilometres south of Muscat. BP is the Operator of Block 61.
Our scope of works includes the complete MEP services for all buildings in both KOB and KRC.
The majority of buildings are of traditional concrete blockwork construction. The workshop/maintenance buildings are steel frame structures.
Scope includes a chilled water district cooling plant and all the MEP services including medical air and 33kV/415V substations.