Posted by Posted by 0 comments
AD-ARRIVALS-HALL-AND-TUNNEL-1
AD-ARRIVALS-HALL-AND-TUNNEL-2
AD-ARRIVALS-HALL-AND-TUNNEL-3
AD-ARRIVALS-HALL-AND-TUNNEL-4
AD-ARRIVALS-HALL-AND-TUNNEL-1
AD-ARRIVALS-HALL-AND-TUNNEL-2
AD-ARRIVALS-HALL-AND-TUNNEL-3
AD-ARRIVALS-HALL-AND-TUNNEL-4

Project details

  • Built Up Area: 4,600 m²
  • Contract period: 6 months
  • Contract Value: AED 15,000,000 ($4,000,000)
  • Location: Abu Dhabi International Airport
  • Client: Abu Dhabi Airports Company

Arrivals Hall & Tunnel

The project consisted of a new tunnel beneath the main access road into the airport, and a vertical core consisting of 3 elevators and 2 travelators which link the existing terminal building to the tunnel and through to the Arrivals Hall. The arrivals hall also consists of meet and greet areas, toilets, car rental, coffee shop and various concessions stands.