Project details

  • Built Up Area: 5,000 m²
  • Contract Period: 4 months
  • Peak Power Voltage (Vmpp): 33.2 V
  • Contract Value: 156.75mmx156.75mm
  • Open Circuit Voltage (Voc): AED 6,000,000 ($1,600,000)
  • Location: The Dubai Mall
  • Client: Design Design
  • Project Engineer: Meinhardt
  • Quantity Surveyors: Omnium

The Gold Souk

The existing gold souk was completely refurbished to become a central hub of the existing Dubai Mall. New MEP works were installed while maintaining full operation of the existing mall by diverting primary services out of the new Gold Souk vicinity. This fast track project demonstrates ALEMCOs ability to deliver high end MEP installations whilst interacting in a live working public environment.